The dilapidated industrial space required complete renovation. The existing 400m2 cold floor was insulated with solid insulation and levelled with screed to allow new carpets to be fitted.
Claridge & Hall undertook all interior decoration and created interior partitioning and mezzanine offices and redistributed metal framed fire break walls. We also changed 3 Phase electrics to single phase and redistributed electrics.
The project was completed within 12 weeks.